Chronology

1975
Sep
NIPPONDENSO REFRIGERACOES LTDA. (NDB) established [4th]
1980
Apr
NIPPONDENSO COMPRESSORES LTDA.(NDBC) established with capital of 50 million CR$ [14th]
Sep
BEFIEX business license acquired (contract expired in March 1992) [15th]
1981
Dec
NDBC - Plant building completed in Curitiba, Paraná (6,000㎡) [11th]
NDBC - Plant building completed in Curitiba, Paraná (6,000㎡) [11th]
1982
Jul
NDBC - Compressor 6P, washer-pump production begins
1986
Oct
NDBC - Plant expanded (7,320㎡), and compressor 10P manufacturing begins [10th]
1987
Mar
In-house production associate training center opens [9th]
1990
Feb
Capital increased to 40 million CR$ [17th]
1991
Aug
NDBC - Air conditioner plant (Curitiba) completed (4,800㎡)
NDBC - Air conditioner plant (Curitiba) completed (4,800㎡)
1992
Apr
NDBC - Ceremony for 10-years in operation held, and air conditioner plant opening ceremony held [27th]
1993
Jul
NDBC - Betim Plant operations begin
Jul
President Award received
1994
Mar
NDBC - São Paulo (Pinda) Plant operations begin
Jul
President Award received
Aug
DENSO INDUSTRIAL DA AMAZONIA LTDA. (DNAZ) established
Dec
In-house production associate training center closes
1995
Dec
NDBC - Air conditioner plant (Curitiba) expanded (4,800㎡)
1996
Mar
MAGNETI MARELLI DENSO S.A. (MMD) established
Jun
NIPPONDENSO COMPRESSORES LTDA. name changed to the current name DENSO DO BRASIL LTDA. (DNBR) [1st]
Jun
DNBR - ISO 9001 certification acquired
1997
Apr
DNAZ - Bus A/C production begins
Apr
MMD - Opening ceremony held [11th]
Jun
DNAZ - Capital increase of 500 million R$ [23rd]
Aug
DNAZ - Moto Honda ACG production begins [10th]
Nov
MMD - ISO 9002 acquired [19th]
1998
Sep
DNBR - Air conditioner plant (Curitiba) expanded (7,200 ㎡) [30th]
Oct
DNBR - Washer pump production discontinued
DNAZ - ISO 9002 acquired
1999
Feb
DNBR - Betim Plant sold to MAGNETI MARELLI CLIMATIZZAZIONE S.p.a. (MMCL) [1st]
Feb
Spun off of the rotary components business unit from MAGNETI MARELLI BRAZIL, MAGNETI MARELLI MAQUINAS ROTANTES established [22nd]
Feb
DMBR - Technical Center constructed at the Curitiba Plant (2,160㎡) [28th]
Apr
MAGNETI MARELLI MANUFACTURING (MMM, current DMIT) becomes a subsidiary DENSO with the purchase of the rotating machines division from MAGNETI MARELLI [26th]
Apr
DNBR - NSR/NWR Radiator and MF condenser production begins
May
DNBR - ST evaporator production begins
Oct
Name changed to the current name of DENSO MAQUINAS ROTANTES do Brasil LTDA. (DMBR) with the acquisition of MMM [1st]
Nov
DNBR - Capital increased by 105 million R$ to 125 million R$ [8th]
Dec
DNAZ - Transferred to the current plant [1st]
DNAZ - Transferred to the current plant [1st]
MAGNETI MARELLI SISTEMAS TERMICOS do Brasil (MMST) acquires the DNBR Betim Plant
2000
Jan
DNBR - ISO 14001 certification acquired
Apr
MMD - QS 9000 and VDA 6 acquired [11th]
Dec
DMBR - Alternator production for FIAT Brazil begins [1st]
New MMST Plant opens
2001
Mar
DENSO acquires MMST [30th]
May
DMBR - Transferred to the current plant [1st]
DMBR - Transferred to the current plant [1st]
May
DNBR - Direct loans (94 million R$) recapitalized, and capital is set to 219 million R$. [28th]
Sep
DNAZ - ACG production and supply for Yamaha Brazil begins
Sep
MMD - Capital increased by 14 million US$
Dec
DMBR - Capital increased by 104 million R$. to 323 million R$. [14th]
Dec
DNAZ - Local production of AGC armature begins. CDI amplifier production begins.
2002
Feb
DNBR - In-house training center (DENSO SCHOOL) opens [27th]
DNBR - In-house training center (DENSO SCHOOL) opens [27th]
Mar
MMD - ISO 14001 acquired [5th]
Apr
Name changed to the current name of DENSO MANUFACTURING ARGENTINA S.A.(DNAR) with the acquisition of MMCL [18th]
Sep
DNAZ - CDI amplifier supply for Yamaha Brazil begins
Name changed current name of DENSO SISTEMAS TERNICOS do Brasil LTDA. (DTBR) with the acquisition of MMCL
DNAZ - ISO 9001 and ISO 14001 acquired
2003
Feb
DMBR - ISO 14001 acquired [13th]
2004
Feb
DNAZ - Regulator supply for Moto Honda & Yamaha Brazil begins
Mar
DNBR - Capital decreased by 132 million R$ to 191 million R$ [16th]
Jul
DNBR - President Award for Outstanding Performance received
Sep
DNBR - ISO/TS-16949 acquired
2005
Aug
DNAZ - FI engine electronic control unit supply for Yamaha Brazil begins
2006
May
DNAR - OHSAS 18001 acquired [16th]
2007
Mar
DNAZ - Bus A/C production transferred from DNBR
Apr
DMBR - Supplier Award received from GM Brazil
May
DNBR - Ceremony for 25-years in operation held [21st]
May
DNAR - Ceremony to commemorate 10-years in operation held [22nd]
Sep
DNBR - IATF 16949 certification acquired [25th]
Nov
DNAZ - Ceremony to commemorate 10-years in operation held
Dec
DNBR - ISO 14001 certification acquired [20th]
2008
Jun
DNAR - Cockpit module production for FIAT Argentina begins
DMBR - ISO 16949 and ISO 9001 acquired
2009
May
DMBR - FIAR QSB certification acquired from FIAT Brazil
Sep
DNAR - Plant expanded to accommodate Nocolok brazing condensers
Nov
DMBR - New alternator production for FIAT Brazil begins (A115Qi 90A/110A)
2010
May
DNBR - RS evaporator production begins
Jun
DNAR - Plant expansion ceremony
DTBR - IATF 16949 and ISO 9001 acquired
DTBR - Ceremony for 10-years in operation held
2011
Jan
DNBR - Santa Bárbara Plant operations begin [14th]
DNBR - Santa Bárbara Plant operations begin [14th]
May
DNBR - ISO 45001 certification acquired [26th]
Jun
DNAR - DNJP acquires all shares of SUMITOMO CORPORATION [13th]
Oct
DMBR - New wiper motor (DM1) production for FIAT Brazil begins
Nov
DNBR - Pinda Plant closes
DMBR - Ceremony for 10-years in operation held
DTBR - ISO 14001 acquired
2012
Apr
DNBR - South American Technical Center established in Santa Bárbara
DNBR - South American Technical Center established in Santa Bárbara
May
DMBR - New rear wiper motor production for FIAT Brazil begins
Jul
DNBR - PA64 Starter production begins
Sep
DNBR - Wiper production begins
Sep
DNAZ - Engine ECU supply for TOYOTA Brazil begins
DNAZ - Engine ECU supply for TOYOTA Brazil begins
DTBR - OHSAS 18001 acquired
2014
Jan
DNBR - SFA2 heater core production begins
Jan
DNAZ - A/C ECU for TOYOTA Brazil and EPS ECU for JABR (JTEKT) supply begins
Mar
DNBR - Meter and GSR radiator production begins
Sep
DNAR - Capital increased by 137 million AR$
Dec
DMBR - Officially designated as a supplier for the GSE Alternator Project for FIAT Brazil
DTBR - Pernambuco Plant production activities begin
2015
Aug
DNAZ - IMV engine ECU and A/C ECU supply for TOYOTA Argentina begins
Nov
DNBR - REC condenser production begins
2016
May
DNAR - Capital increased by 121 million AR$
Jul
DNBR - President Award received
DTBR - GSR radiator (16mm/27mm) production begins
2017
Jan
DMBR - CE alternator production for TOYOTA Brazil begins
Jun
DNAZ - Meter supply for Honda Brazil begins
Jul
DNBR - President Award received
Sep
DNAR - Ceremony to commemorate 20-years in operation held
2018
Jun
DNBR - Washer tank production begins
Jun
DMBR - President Award received (Award of Honor)
Jul
DNAR - IATF certification acquired
Jul
DTBR - Heat exchanger production for Medium/large agricultural construction equipment begins
2019
May
DNAR - HVAC production for RENAULT Argentina begins
Oct
DNAZ - Agri-tech business production begins
2020
Jun
DMBR - President Award received (Award for Excellence)
Dec
DNAR - 67 KW photovoltaic energy system installed
2021
Mar
DMBR - Csc0 production for GM Brazil and TOYOTA Brazil begins
2022
Apr
DNBR - ISO 14064-3:2007 certification acquired [27th]
Jun
DNBR - PAS 2060 certification acquired [12th]